Physical Backup Recovery and Deployment Rollback Validation
Completed an isolated recovery exercise covering database, Auth, private Storage objects and a compatible application rollback.
Read details
- Restored an isolated Supabase project from a physical backup and reconciled representative protected content, Storage metadata and schema migrations against the source.
- Rehydrated protected Storage content required for the isolated recovery exercise and re-established environment-specific authentication and API configuration.
- Verified account sign-in, repair history, a protected draft, row-level access controls and private-asset delivery through the Branch Preview using an isolated non-production identity.
- Built and tested an earlier compatible application commit against the recovered project, then returned the Branch Preview to the current commit. Production was not changed.
- Measured approximately 7 hours 20 minutes of restore-point age, three to four minutes for database-project readiness and approximately 3 hours 2 minutes for the complete manual operational exercise. These observations are not contractual service levels.
